Projects
Read-only copy of Project mission control in Notion. TimeTracker never writes to that database. Active for coding = Status not Pause/Complete and (when present) the TimeTracker checkbox is on.
- No projects loaded yet. Click Refresh from Notion (integration must stay connected to Mission Control).